HomeCostGuide

How Much Does Cabinet Refacing Cost in Columbus, OH?

Updated March 2026 · Columbus metro area · Based on BLS wage data and local market costs

Columbus Average Cost (per kitchen)
Low
$3,600
Average
$6,750
High
$10,800
BudgetMid-RangePremium

Itemized Cost Breakdown

Estimated for Kitchen (20-30 doors typical): 1 kitchen · Mid-Range tier · Local cost index: 0.9x

Line ItemLowMidHigh
New doors & drawer fronts
Replacement cabinet doors and drawer faces
Shop Kitchen Cabinets
$1,800$3,600$5,400
Veneer/laminate
Veneer or laminate covering for cabinet boxes
Shop Kitchen Cabinets
$450$1,125$1,800
Hardware
New hinges, pulls, knobs, and soft-close hardware
$180$450$720
Molding & trim
Crown molding, light rail, filler strips
$90$270$450
Labor
Cabinet refacing specialist (3-5 days)
$1,350$2,475$3,600
Total Estimated Cost$3,870$7,920$11,970

Costs adjusted for local market conditions. Actual prices vary based on project specifics, contractor, and material choices.

Affiliate Disclosure: Some product links on this page are affiliate links. If you purchase through these links, we may earn a small commission at no additional cost to you. This helps support our free cost guides. We only link to retailers we trust. Learn more about our methodology.

Cost Calculator

Adjust project size and material tier to estimate your cost.

13
Your Estimated Cost
Low
$3,870
Average
$7,920
High
$11,970
View itemized breakdown
ItemLowHigh
New doors & drawer fronts$1,800$5,400
Veneer/laminate$450$1,800
Hardware$180$720
Molding & trim$90$450
Labor$1,350$3,600
Total$3,870$11,970

Estimates based on local cost data. Get quotes from licensed contractors for accurate pricing.

What Drives Cabinet Refacing Cost in Columbus?

The average cost of cabinet refacing in Columbus, OH is $6,750 per kitchen. Most homeowners pay between $3,600 and $10,800, depending on the scope of work, materials selected, and contractor experience.

Refacing or refinishing existing kitchen cabinets with new doors, drawer fronts, and veneer.

Local Labor Costs

Construction workers in Columbus earn an average of $23/hr 1% above the national average. Labor typically accounts for 40-60% of total project cost.

Materials in OH are subject to 7.50% sales tax, which adds to the overall project cost. For a $6,750 project, expect roughly $203 in tax on materials alone.

Columbus issued approximately 12,800 residential building permits in 2023, putting it in the mid-range of US construction markets. High permit activity can mean busier contractors and longer wait times for scheduling.

Factors That Affect Cost

  • Kitchen size
  • Door style
  • Material choice
  • Hardware
  • Soft-close upgrades
  • Contractor experience — Established contractors with strong reviews may charge 10-20% more
  • Local cost of livingColumbus's cost index is 0.9x the national baseline

Best Time for Cabinet Refacing in Columbus

Columbus has four distinct seasons with cold, snowy winters and warm summers. Spring through fall is the primary building season. Winter ground freezing affects foundation work and excavation.

Best Months

May, Jun, Sep, Oct

Lower demand often means better pricing and faster scheduling.

Peak Season (Higher Prices)

Dec, Jan, Feb

High demand can add 10-20% to project costs.

Monthly Weather in Columbus

MonthJanFebMarAprMayJunJulAugSepOctNovDec
Avg High36°40°51°63°73°82°85°84°78°65°52°40°
Avg Low21°23°31°40°50°60°64°62°55°43°34°25°
Rain (in)2.82.233.44.14.14.73.32.82.632.8

Source: Open-Meteo historical data (2024)

Licensing & Permits in OH

Ohio does not require a state-level general contractor license. Columbus requires local contractor registration. Specialty trades (plumbing, electrical, HVAC) require state licensing.

Verify a contractor's license at Ohio Department of Commerce - Industrial Compliance.

How to Save Money on Cabinet Refacing

  • Get at least 3 quotes from licensed contractors in Columbus
  • Schedule during off-peak months (May, Jun, Sep, Oct) for lower prices
  • Clarify permit costs upfront — they vary by jurisdiction
  • Consider mid-range materials for the best value-to-quality ratio
  • Verify contractor licensing through Ohio Department of Commerce - Industrial Compliance
  • Ask about material package deals or contractor supplier discounts

Frequently Asked Questions

Refacing vs. replacing cabinets — which is better?
Refacing costs 40-60% less than full replacement and takes 3-5 days vs 3-5 weeks. Choose replacement only if the cabinet boxes are damaged or you want a new layout.

Cabinet Refacing Cost in Other Cities

Other Costs in Columbus

Ready to Get Quotes?

Browse top-rated Columbus contractors

Find Contractors