How Much Does Pool Construction Cost in Raleigh, NC?

Updated March 2026 · Raleigh metro area · Based on BLS wage data and local market costs

Raleigh Average Cost (per project)
Low
$23,750
Average
$38,000
High
$61,750
BudgetMid-RangePremium

Itemized Cost Breakdown

Estimated for Pool (12x24 avg): 1 project · Mid-Range tier · Local cost index: 0.95x

Line ItemLowMidHigh
Pool shell
Fiberglass, vinyl liner, or gunite/concrete pool shell
$9,500$19,000$28,500
Excavation
Digging, hauling dirt, and site prep
$1,900$4,750$7,600
Plumbing & filtration
Pump, filter, heater, and plumbing lines
$1,900$3,325$4,750
Electrical
Subpanel, pump wiring, lighting, GFCI protection
$1,425$2,613$3,800
Decking/coping
Pool deck surface and coping around pool edge
$1,900$4,750$7,600
Safety fencing
Required pool safety fence with self-closing gate
Shop Fencing
$950$1,900$2,850
Permits
Pool construction, electrical, and plumbing permits
$475$1,188$1,900
Labor
Pool builder crew (several weeks)
$4,750$8,075$11,400
Total Estimated Cost$22,800$45,600$68,400

Costs adjusted for local market conditions. Actual prices vary based on project specifics, contractor, and material choices.

Affiliate Disclosure: Some product links on this page are affiliate links. If you purchase through these links, we may earn a small commission at no additional cost to you. This helps support our free cost guides. We only link to retailers we trust. Learn more about our methodology.

Cost Calculator

Adjust project size and material tier to estimate your cost.

13
Your Estimated Cost
Low
$22,800
Average
$45,600
High
$68,400
View itemized breakdown
ItemLowHigh
Pool shell$9,500$28,500
Excavation$1,900$7,600
Plumbing & filtration$1,900$4,750
Electrical$1,425$3,800
Decking/coping$1,900$7,600
Safety fencing$950$2,850
Permits$475$1,900
Labor$4,750$11,400
Total$22,800$68,400

Estimates based on local cost data. Get quotes from licensed contractors for accurate pricing.

What Drives Pool Construction Cost in Raleigh?

The average cost of pool construction in Raleigh, NC is $38,000 per project. Most homeowners pay between $23,750 and $61,750, depending on the scope of work, materials selected, and contractor experience.

Construction of an inground swimming pool including excavation, shell, and equipment.

Local Labor Costs

Construction workers in Raleigh earn an average of $22.4/hr 2% below the national average. Labor typically accounts for 40-60% of total project cost.

Materials in NC are subject to 7.25% sales tax, which adds to the overall project cost. For a $38,000 project, expect roughly $1,102 in tax on materials alone.

Raleigh issued approximately 19,200 residential building permits in 2023, putting it in the upper range of US construction markets. High permit activity can mean busier contractors and longer wait times for scheduling.

Factors That Affect Cost

  • Pool size
  • Pool type (concrete, fiberglass, vinyl)
  • Features
  • Decking
  • Fencing
  • Contractor experience — Established contractors with strong reviews may charge 10-20% more
  • Local cost of livingRaleigh's cost index is 0.95x the national baseline

Best Time for Pool Construction in Raleigh

Raleigh-Durham enjoys a moderate climate with four seasons. Spring and fall are best for exterior work. Summer humidity affects paint drying and concrete curing times.

Best Months

Apr, May, Sep, Oct, Nov

Lower demand often means better pricing and faster scheduling.

Peak Season (Higher Prices)

Jan, Jul, Aug

High demand can add 10-20% to project costs.

Monthly Weather in Raleigh

MonthJanFebMarAprMayJunJulAugSepOctNovDec
Avg High50°54°62°72°79°86°90°88°82°72°62°52°
Avg Low30°32°38°47°56°65°69°68°61°49°39°32°
Rain (in)3.43.13.82.93.73.84.44.343.22.93

Source: Open-Meteo historical data (2024)

Licensing & Permits in NC

North Carolina requires a general contractor license for projects over $30,000. Licensed through the NC Licensing Board for General Contractors.

Verify a contractor's license at NC Licensing Board for General Contractors.

In NC, a contractor license is required for projects over $30,000. Always verify before hiring.

How to Save Money on Pool Construction

  • Get at least 3 quotes from licensed contractors in Raleigh
  • Schedule during off-peak months (Apr, May, Sep, Oct, Nov) for lower prices
  • Clarify permit costs upfront — they vary by jurisdiction
  • Consider mid-range materials for the best value-to-quality ratio
  • Verify contractor licensing through NC Licensing Board for General Contractors
  • Ask about material package deals or contractor supplier discounts

Frequently Asked Questions

How long does pool construction take?
Fiberglass pools take 2-4 weeks. Concrete pools take 8-16 weeks.